TABLE OF CONTENTS
PROJECT ORGANIZATION AND CONTACTS OF KEY MANAGEMENT
CONSTRUCTION PROGRAMME AND SYNOPSIS OF WORK
3. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
MONITORING PARAMETERS AND MONITORING LOCATIONS
MONITORING METHODOLOGY AND CALIBRATION DETAILS
ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)
ENVIRONMENTAL MITIGATION MEASURES
WEATHER CONDITIONS
AIR QUALITY
CONSTRUCTION NOISE
WATER QUALITY
UNDERGROUND WATER LEVEL
IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES
SITE AUDIT SUMMARY
EFFECTIVENESS OF MITIGATION MEASURES
STATUS OF ENVIRONMENTAL LICENSING AND PERMITTING
STATUS OF WASTE MANAGEMENT
SUMMARY OF EXCEEDANCES
CONSTRUCTION IMPACTS ON SUSPENDED SOLIDS
REVIEW OF THE REASONS FOR AND THE IMPLICATIONS OF NON-COMPLIANCE
7. ENVIRONMENTAL
COMPLAINTS AND PROSECUTIONS
8. COMMENTS,
CONCLUSIONS AND RECOMMENDATIONS
LIST OF TABLE
Table I Summary Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary Table for Key Information in the Reporting Quarter
Table 2.1 Key Project Contacts
Table 4.1 Summary of Water Quality Exceedances in the Reporting Quarter
Table 4.2 Ground Water Level Monitoring Data at Location ADH48 in Reporting Quarter
Table 6.1a-b Summary of Measured levels of Suspended Solids
LIST OF FIGURES
Figure 1 Layout Plan of the Project
Figure 3a Locations of Air Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3b Locations of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure 4a-b Locations of Water Quality Monitoring Stations
Figure 5 Location of Ground Water Level Monitoring Stations
LIST OF APPENDICES
C Action and Limit Levels for Air Quality, Noise and Water Quality
D Graphical Presentation of Air Quality Monitoring Results
E Graphical Presentation of Noise Monitoring Results
F Graphical Presentation of Water Quality Monitoring Results (DO, Turb & SS)
G Environmental Mitigation Implementation Schedule (EMIS)