TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

KEY ISSUES FOR THE COMING MONTH

1.   INTRODUCTION

2.   PROJECT CHARACTERISTICS

PROJECT ORGANIZATION AND CONTACTS OF KEY MANAGEMENT

CONSTRUCTION PROGRAMME AND SYNOPSIS OF WORK

3.   ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS

MONITORING PARAMETERS AND MONITORING LOCATIONS

MONITORING METHODOLOGY AND CALIBRATION DETAILS

ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS) 

ENVIRONMENTAL MITIGATION MEASURES

4.   MONITORING RESULTS

WEATHER CONDITIONS

AIR QUALITY

CONSTRUCTION AIRBORNE NOISE

CONSTRUCTION GROUND BORNE NOISE

WATER QUALITY

UNDERGROUND WATER LEVEL

5.   ENVIRONMENTAL AUDIT

IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES

SITE AUDIT SUMMARY

EFFECTIVENESS OF MITIGATION MEASURES

STATUS OF ENVIRONMENTAL LICENSING AND PERMITTING

STATUS OF WASTE MANAGEMENT

6.   NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)

SUMMARY OF EXCEEDANCES

CONSTRUCTION IMPACTS ON SUSPENDED SOLIDS

REVIEW OF THE REASONS FOR AND THE IMPLICATIONS OF NON-COMPLIANCE

7.   ENVIRONMENTAL COMPLAINTS AND PROSECUTIONS

8.   COMMENTS, CONCLUSIONS AND RECOMMENDATIONS

 

 

 

LIST OF TABLE

 

Table I     Summary Table for Non-compliance Recorded in the Reporting Quarter

Table II   Summary Table for Key Information in the Reporting Quarter

Table 2.1 Key Project Contacts

Table 4.1 Ground Water Level Monitoring Data in Reporting Quarter

 

 

LIST OF FIGURES

 

Figure 1                 Layout Plan of the Project

Figure 2                 Organization Chart

Figure 3.1a            Locations of Air Quality and Construction Noise Monitoring Stations at Eastern Portal

Figure 3.1b            Locations of Air Quality and Construction Noise Monitoring Stations at Western Portal

Figure 3.1c            Locations of Construction Noise Monitoring Stations at Intake E7

Figure 3.1d            Locations of Construction Noise Monitoring Stations at Intake PFLR1

Figure 3.1e            Locations of Construction Noise Monitoring Stations at Intake W0

Figure 3.1f            Locations of Construction Noise Monitoring Stations at Intake RR1

Figure 3.1g            Locations of Construction Noise Monitoring Stations at Intake W5

Figure 3.1h            Locations of Construction Noise Monitoring Stations at Intake E5A

Figure 3.1i             Locations of Construction Noise Monitoring Stations at Intake THR2

Figure 3.1j             Locations of Construction Noise Monitoring Stations at Intake P5

Figure 3.1k            Locations of Construction Noise Monitoring Stations at Intake W8

Figure 3.1l             Locations of Construction Noise Monitoring Stations at Intake DG1

Figure 3.1m           Locations of Construction Noise Monitoring Stations at Intake MA14

Figure 3.1n            Locations of Construction Noise Monitoring Stations at Intake BR6

Figure 3.1o            Location of Construction Ground Borne Noise Monitoring Station

Figure 4.1a-b         Locations of Water Quality Monitoring Stations

Figure 4.2a-e         Location of Ground Water Level Monitoring Stations

 

 

LIST OF APPENDICES

A          Construction Programme

B          Monitoring Requirements

C          Action and Limit Levels for Air Quality, Noise and Water Quality

D          Graphical Presentation of Air Quality Monitoring Results

E          Graphical Presentation of Noise Monitoring Results

F          Environmental Mitigation Implementation Schedule (EMIS)

G          Site Audit Summary

H          Summary Status of Environmental Licences and Permits

I           Waste Generated Quantity

J          Summary of Exceedances

K          Complaint Log

L          Graphical Presentation of Baseline Review for Water Quality Monitoring (Dissolved Oxygen and Turbidity & Suspended Solids)