
TABLE OF CONTENTS
KEY ISSUES FOR THE COMING MONTH
PROJECT ORGANIZATION AND CONTACTS OF KEY MANAGEMENT
CONSTRUCTION PROGRAMME AND SYNOPSIS OF WORK
3. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
MONITORING PARAMETERS AND MONITORING LOCATIONS
MONITORING METHODOLOGY AND CALIBRATION DETAILS
ENVIRONMENTAL QUALITY PERFORMANCE LIMITS (ACTION AND LIMIT LEVELS)
ENVIRONMENTAL MITIGATION MEASURES
WEATHER CONDITIONS
AIR QUALITY
CONSTRUCTION AIRBORNE NOISE
CONSTRUCTION GROUND BORNE NOISE
WATER QUALITY
UNDERGROUND WATER LEVEL
IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES
SITE AUDIT SUMMARY
EFFECTIVENESS OF MITIGATION MEASURES
STATUS OF ENVIRONMENTAL LICENSING AND PERMITTING
STATUS OF WASTE MANAGEMENT
SUMMARY OF EXCEEDANCES
CONSTRUCTION IMPACTS ON SUSPENDED SOLIDS
REVIEW OF THE REASONS FOR AND THE IMPLICATIONS OF NON-COMPLIANCE
7. ENVIRONMENTAL COMPLAINTS AND PROSECUTIONS
8. COMMENTS, CONCLUSIONS AND RECOMMENDATIONS
LIST OF TABLE
Table I Summary
Table for Non-compliance Recorded in the Reporting Quarter
Table II Summary
Table for Key Information in the Reporting Quarter
Table 2.1 Key
Project Contacts
Table 4.1 Ground
Water Level Monitoring Data in Reporting Quarter
LIST OF FIGURES
Figure 1 Layout
Plan of the Project
Figure
3.1a Locations
of Air Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure
3.1b Locations
of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure
3.1c Locations
of Construction Noise Monitoring Stations at Intake E7
Figure
3.1d Locations
of Construction Noise Monitoring Stations at Intake PFLR1
Figure
3.1e Locations
of Construction Noise Monitoring Stations at Intake W0
Figure
3.1f Locations
of Construction Noise Monitoring Stations at Intake RR1
Figure
3.1g Locations
of Construction Noise Monitoring Stations at Intake W5
Figure
3.1h Locations
of Construction Noise Monitoring Stations at Intake E5A
Figure
3.1i Locations
of Construction Noise Monitoring Stations at Intake THR2
Figure
3.1j Locations
of Construction Noise Monitoring Stations at Intake P5
Figure
3.1k Locations
of Construction Noise Monitoring Stations at Intake W8
Figure
3.1l Locations
of Construction Noise Monitoring Stations at Intake DG1
Figure
3.1m Locations
of Construction Noise Monitoring Stations at Intake MA14
Figure
3.1n Locations
of Construction Noise Monitoring Stations at Intake BR6
Figure
3.1o Location
of Construction Ground Borne Noise Monitoring Station
Figure
4.1a-b Locations
of Water Quality Monitoring Stations
Figure
4.2a-e Location
of Ground Water Level Monitoring Stations
LIST OF APPENDICES
C Action
and Limit Levels for Air Quality, Noise and Water Quality
D Graphical
Presentation of Air Quality Monitoring Results
E Graphical
Presentation of Noise Monitoring Results
F Environmental
Mitigation Implementation Schedule (EMIS)
H Summary
Status of Environmental Licences and Permits
L Graphical Presentation of Baseline Review for
Water Quality Monitoring (Dissolved
Oxygen and Turbidity & Suspended Solids)