TABLE OF CONTENTS
Introduction
Environmental Monitoring Works
Environmental Licenses and Permits
Key Information in the Reporting Month
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Site Audits
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Status of Waste Management
Implementation Status of Environmental Mitigation Measures
Non-compliance Recorded during Site Inspections
Summary of Mitigation Measures Implemented
Implementation Status of Event Action Plans
Summary of Complaints and Prosecutions
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
Construction Program for the Next Month
6. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary Table for Non-compliance Recorded in the Reporting Month
Table II Summary Table for Key Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air Quality Monitoring
Table 2.2 Air Quality Monitoring Equipment
Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration
Table 2.4 Summary Table of Air Quality Monitoring Results in April 2008
Table 3.1 Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise Monitoring Parameters, Frequency and Duration
Table 3.4 Baseline Noise Level and Noise Limit Level for Monitoring Stations
Table 3.5 Summary Table of Noise Monitoring Results in April 2008
Table 4.1 Summary of Environmental Licensing and Permit Status
Table 4.2 Observations and Recommendations of Site Inspections
LIST OF FIGURES
Figure 1.1 Layout Plan of the Project Site
Figure 2.1 ET’s Organization Chart
Figure 3.1 Locations of Air Quality and Construction Noise Monitoring Stations
LIST OF APPENDICES
A Action and Limit Levels for Air Quality and Noise
B Copies of Calibration Certificates
C Environmental Monitoring Schedules
D 1-hour TSP Monitoring Results, Graphical Presentations
E 24-hour TSP Monitoring Results, Graphical Presentations
F Noise Monitoring Results and Graphical Presentations
I Environmental Mitigation Implementation Schedule (EMIS)
ABBREVIATION AND ACRONYM
AL Levels Action and Limit Levels
CEDD Civil Engineering & Development Department
E / ER Engineer/Engineer’s Representative
EIA Environmental Impact Assessment
EM&A Environmental Monitoring and Audit
EMIS Environmental Mitigation Implementation Schedule
EP Environmental Permit
EPD Environmental Protection Department
ET Environmental Team
HVS High Volume Sampler
IEC Independent Environmental Checker
RE Resident Engineer
RH Relative Humidity
TSP Total Suspended Particulates
QA/QC Quality Assurance / Quality Control
SLM Sound Level Meter
WMP Waste Management Plan