APPENDIX K ¡V COMPLAINT LOG

 

 

Reporting Period: 29th April to 31st May 2008

 

Log Ref.

Location

Received Date

Details of Complaint

Investigation/Mitigation Action

Status

Com-2008-05-003

Construction site at Eastern Portal

22 May 2008

The complaint was lodged by Ms. Ng on 22 May 2008 regarding noise nuisance generated from the construction activities at the construction site of Eastern Portal

According to the Contractor, only one excavator and one generator were operated for the excavation works around 8 am on 22 May 2008 at the Eastern portal. No other construction activities were conducted.

 

In response to the complaint, The Contractor agreed to reschedule their current works activities, with immediate effect from 23 May 2008, that only site preparation works without noise nuisance to the nearby residents will be carried out from 7:00 am to 8:00 am at the Eastern Portal area.

 

Base on the information collected and the monitoring results, the complaint was considered not justifiable since (1) no exceedance of the noise monitoring results was recorded in May and (3) no non-compliance or observation on noise was recorded.

 

Closed

Com-2008-05-004

Construction site at Western Portal (Marine Works)

31 May 2008

The complaint was lodged by one of the local resident on 31 May 2008 regarding the noise nuisance generated from the marine works at Western Portal.

According to the Contractor, only two derrick barges and one tug boat were operated for the seabed formation works around 18:00 hrs on 31 May 2008 at the Western Portal. No other construction activities were conducted.

 

 

Base on the information collected and the monitoring results, the complaint was considered not justifiable since (1) no exceedance of the noise monitoring results was recorded in May and (3) no non-compliance or observation on noise was recorded.

 

Closed