Contract No. DC/2007/10 ¡V Design and Construction of Hong Kong West Drainage Tunnel

 

Exceedance Report

 

Eastern Portal

(A)  Exceedance Report for Air Quality (1 hour TSP)

(NIL in the reporting month)

 

(B)  Exceedance Report for Air Quality (24 hours TSP)

(NIL in the reporting month)

 

(C)  Exceedance Report for Construction Noise

(NIL in the reporting month)

 

Western Portal

(D)  Exceedance Report for Air Quality (1 hour TSP)

(NIL in the reporting month)

 

(E)   Exceedance Report for Construction Noise

(NIL in the reporting month)

 

(F)   Exceedance Report for Water Quality

(3, 23 and 30 June 2008 in the reporting month)


Contract No. DC/2007/10

Design and Construction of Hong Kong West Drainage Tunnel - Exceedance Report

Report No. 80604W-80603_S

Part A ¡V Exceedance Summary Tables (3 June 2008)

Table 1:    Parameter ¡V Suspended Solids (mg/L)

Station No.

Tide

Baseline Action Level (mg/l)

Baseline Limit Level (mg/l)

Measured value (mg/l)

Control Station(s)

Measured Value at Control Stations

(mg/l)

120% of Control Station Action Level

(mg/l)

130% of Control Station Limit Level

(mg/l)

Level Exceeded

 

Justification*

I1

Mid-ebb

15.7

16.4

19.3

CE

19.8

23.8

25.7

Limit

(3)

I2

17.8

Limit

(3)

Intake A

20.7

Limit

(1) &  (3)

Intake B

20.7

Limit

(1) &  (3)

I2

Mid-flood

19.5

CF

17.5

21.0

22.8

Limit

(3)

Intake A

17.7

Limit

(1) &  (3)

Intake B

16.0

Action

(1) &  (3)

 

*Remarks  (1) ¡V No construction activity was observed.

                                (2) ¡V No pollution discharge from construction activity was observed.

                                (3) ¡V Control Station value already exceeded either the Baseline Action or Limit Levels.


Contract No. DC/2007/10

Design and Construction of Hong Kong West Drainage Tunnel - Exceedance Report

Report No. 80625W-80623_S

Part A ¡V Exceedance Summary Tables (23 June 2008)

Table 1:    Parameter ¡V Suspended Solids (mg/L)

Station No.

Tide

Baseline Action Level (mg/l)

Baseline Limit Level (mg/l)

Measured value (mg/l)

Control Station(s)

Measured Value at Control Stations

(mg/l)

120% of Control Station Action Level

(mg/l)

130% of Control Station Limit Level

(mg/l)

Level Exceeded

 

Justification*

I2

Mid-ebb

15.7

16.4

17.0

CE

16.0

19.2

20.8

 

Limit

 

 

 

 (2) &  (3)

 

 

I2

 

Mid-flood

16.7

CF

16.3

19.6

21.2

Limit

 

(2) &  (3)

 

*Remarks  (1) ¡V No construction activity was observed.

                                (2) ¡V No pollution discharge from construction activity was observed.

                                (3) ¡V Control Station value already exceeded either the Baseline Action or Limit Levels.


Contract No. DC/2007/10

Design and Construction of Hong Kong West Drainage Tunnel - Exceedance Report

Report No. 80703W-80630_S

Part A ¡V Exceedance Summary Tables (30 June 2008)

Table 1:    Parameter ¡V Suspended Solids (mg/L)

Station No.

Tide

Baseline Action Level (mg/l)

Baseline Limit Level (mg/l)

Measured value (mg/l)

Control Station(s)

Measured Value at Control Stations

(mg/l)

120% of Control Station Action Level

(mg/l)

130% of Control Station Limit Level

(mg/l)

Level Exceeded

 

Justification*

II

Mid-ebb

15.7

16.4

20.8

CE

27.8

33.4

36.1

 

Limit

 

 

 (2) &  (3)

I2

22.7

Intake A

23.3

 

(1) &  (3)

Intake B

25.3

II

Mid-flood

17.2

CF

19.3

23.2

25.1

Limit

 

(2) &  (3)

I2

21.0

Intake A

23.0

 

(1) &  (3)

Intake B

21.2

 

*Remarks  (1) ¡V No construction activity was observed.

                                (2) ¡V No pollution discharge from construction activity was observed.

                                (3) ¡V Control Station value already exceeded either the Baseline Action or Limit Levels.