Table 5.2 Observations and
Recommendations of Site Inspections
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Water Quality |
|
Standing water was observed in the valley at Eastern Portal. The
Contractor was reminded to dry it out and pave it to prevent mosquito breed. |
*Follow-up action was needed for the item. |
|
|
Standing water was observed at the tank, valley
and the bin at Eastern Portal. The Contractor was reminded to clear them and
cover the items which may retain water. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Silty water was observed in the drainage channel
at the entrance of Eastern Portal. The Contractor was reminded to pump it
back for treating before discharging out. |
This
item was not rectified during the follow-up audit session. Follow-up action
was needed for the outstanding item. |
|
|
|
|
Silty water was observed in the drainage channel
at the entrance of Eastern Portal. The Contractor was reminded to pump it
back for treating before discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Sediment was observed at the drainage channel at
Western Portal. The Contractor was reminded to clear them to maintain the
drainage system can function properly. |
*Follow-up action was needed for the item. |
|
|
|
Standing water was observed at the entrance of
Eastern Portal site. The Contractor was reminded to dry it out. |
*Follow-up action was needed for the item. |
|
|
|
Worn sand bags
were observed at both Eastern and Western Portals. The Contractor was
reminded to replace them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
|
Standing water was observed at the entrance of
Eastern Portal. The Contractor was reminded to clear them and provided
mitigation measures to prevent any water from construction site discharging
to the public road. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Sediment was observed at the drainage channel at
Western Portal. The Contractor was reminded to clear them. |
*Follow-up action was needed for the item. |
|
|
|
Silty water was observed discharging to the tank
at Western Portal. The Contractor was reminded to pump it out for treatment
before discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
Waste / Chemical Management |
|
Chemical waste was observed without suitable storage area at Eastern
Portal. The Contactor was reminded to provide the storage area enclosed on at
least three sides by a wall etc. as soon as possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Oil leakage was observed at Eastern Portal. The Contractor was
reminded to clear them as soon as possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Ecology |
|
Worn sand bags were observed at both Eastern and Western Portals. The
Contractor was reminded to replace them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
Reminders |
|
The Contractor was reminded of the followings: - Stockpile more than |
*Follow-up action was needed for the item. |
Note: (*) The Environmental deficiencies
have been rectified by the Contractor. However, the item was reoccurred during the
follow-up site audit due to construction activities/rainstorm. The Contractor
was reminded to rectify the deficiencies more frequently.