Water Quality |
|
Sediment was observed at the drainage channel at Western Portal. The
Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Eastern Portal Silty water
discharge was observed from the site. The Contractor was reminded to clear
the desilting facilities more frequently to
maintain it can function properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Intakes (MBD2) Wastewater was observed discharging from the
plant equipment to the public road. The Contractor was reminded to erect sand
bags bund to prevent any wastewater from discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Air Quality |
|
Western Portal Stockpile of cement materials was observed on
site. The Contractor was reminded to clear them or cover with tarpaulin. |
Rectification/improvement
was observed during the follow-up audit session. |
|
Waste / Chemical Management |
|
Oil leakage was observed from the plant equipments at both Eastern
and Western Portals. The Contractor was reminded to clear them and the
equipments should be well-maintained to prevent oil leakage. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Western Portal Discarded cement bags (abandon) was observed on
site. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Intakes (MB16) General refuses and discarded leaves were
observed in the stream water. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Intakes (MBD2) Discarded leaves were observed around the site.
The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Ecology |
|
Worn sand bags were observed at Eastern Portal near the existing
stream. The Contractor was reminded to replace them and provide maintenance
more frequently. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Eastern Portal Sediment was observed at the access road near the existing stream.
The Contractor was reminded to clear them regularly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Reminders |
|
The Contractor was reminded of the followings: - Standing
water at both Eastern and Western Portals site should be cleared after the
rain. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
The Contractor was reminded of the followings: - Stockpile
at Western Portal should be covered with tarpaulin during rainstorm to
prevent surface runoff and dust generation. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
The Contractor was reminded of the followings: - Standing
water at Eastern Portal site should be cleared after washing the site area. |
Rectification/improvement
was observed during the follow-up audit session. |
Note: (*) The Environmental deficiencies
have been rectified by the Contractor. However, the item was reoccurred during the
follow-up site audit due to construction activities/rainstorm. The Contractor
was reminded to rectify the deficiencies more frequently.