Table 5.2 Observations and
Recommendations of Site Inspections
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Water Quality |
|
Standing water at the top of oil drum was
observed at Intake MA17. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Silty water was observed discharging out to the
public drain at Intake RR1. The Contractor was reminded to provide mitigation
measures to prevent any wastewater from running out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Leakage of water from the construction site at
the bottom of hoarding at Eastern Portal was observed. The Contractor was
reminded to seal the hoarding properly. |
The item was not rectified during the follow-up
audit session. |
|
|
|
Standing water was observed at the pit area at Eastern
Portal. The Contractor was reminded to dry it out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Silty water with oil leakage was observed
discharging to the public drain at Eastern Portal. The Contractor was
reminded to ensure all the wastewater from the Construction site should be
treated before discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Drainage channel to nullah was observed
accumulate with construction material at Western Portal. The Contractor was
reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Standing water with remaining oil was observed at
underneath of air compressor at Western Portal. The Contractor was reminded
to clear them properly. |
*Follow-up action was needed for the item. |
|
|
|
Silty water was observed discharging to the
public road at Intake RR1. The Contractor was reminded to provide mitigation
measures to prevent any wastewater from discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Leakage of water from the construction site at
the bottom of hoarding at Eastern Portal was observed. The Contractor was
reminded to seal the hoarding properly. |
The item was not rectified during the follow-up
audit session. |
|
|
|
Leakage of water from the construction site at
the bottom of hoarding at Eastern Portal was observed. The Contractor was
reminded to seal the hoarding properly. |
The item was not rectified during the follow-up
audit session. |
|
|
|
Overflow of water from the recycle water
treatment tank was observed at Intake MA17. The Contractor was reminded to
maintain the function of the tank properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Leakage of water from the construction site at
the bottom of hoarding at Eastern Portal was observed. The Contractor was
reminded to seal the hoarding properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Standing water was observed at the pit area at
Eastern Portal. The Contractor was reminded to dry it out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Exposed slope was observed dry and without cover
at Western Portal. The Contractor was reminded to cover it with tarpaulin. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Air Quality |
|
Silt was observed at the public road near Intake
MA17. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Unpaved area was observed dry at Western Portal.
The Contractor was reminded to provide water-spray more frequently. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Noise |
|
Noise from GI works was noticed at Intake RR1.
The Contractor was reminded to provide noise control measures to minimize
noise to the nearest residents. |
Rectification/improvement
was observed during the follow-up audit session. |
|
Waste / Chemical Management |
|
Oil container was observed without cover and drip
tray at Eastern Portal. The Contractor was reminded to store it properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Standing water with remaining oil was observed at
underneath of air compressor at Western Portal. The Contractor was reminded
to clear them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Oil leakage was observed from the air compressor
at Western Portal. The Contractor was reminded to clear them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Oil container was observed without drip tray at
Western Portal. The Contractor was reminded to store it properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
Oil leakage was observed from the mobile crane at
Western Portal. The Contractor was reminded to clear them properly. |
*Follow-up action was needed for the item. |
|
|
|
Oil stains were observed at the paved area at
Eastern Portal. The Contractor was reminded to clear them and well-maintained
the plants. |
*Follow-up action was needed for the item. |
|
|
|
Oil container with chemical oil was observed
without drip tray and cover at Eastern Portal. The Contractor was reminded to
store it properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
|
The valve of the drip tray at Intake MA17 was
observed without cover. The Contractor was reminded to seal it properly. |
*Follow-up action was needed for the item. |
|
|
|
Oil stains were observed at the paved area at
Eastern Portal. The Contractor was reminded to clear them and well-maintained
the plants to prevent further oil leakage. |
*Follow-up action was needed for the item. |
|
|
|
Oil stain was observed at underneath of mobile
crane at Western Portal. The Contractor was reminded to well-maintained the
plants to prevent further oil leakage. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Ecology |
|
Worm sand bags were observed at the access road
at Eastern Portal near existing stream. The Contractor was reminded to
replace them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Sediment accumulates at the access road at
Eastern Portal. The Contractor was reminded to clear them. |
*Follow-up action was needed for the item. |
|
|
Reminders |
|
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western and Intake sites. |
*Follow-up action was needed for the item. |
|
|
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
|
|
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
|
|
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
|
|
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
Note: (*) The Environmental deficiencies
have been rectified by the Contractor. However, the item was reoccurred during the
follow-up site audit due to construction activities/rainstorm. The Contractor
was reminded to rectify the deficiencies more frequently.