Table 5.2 Observations and
Recommendations of Site Inspections
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Water Quality |
10/12/2008 |
Standing water was observed near the tunnel at
Western Portal. The Contractor was reminded to dry it out. |
The item was not rectified during the follow-up
audit session. |
|
17/12/2008 |
Standing water was observed near the tunnel at
Western Portal. The Contractor was reminded to dry it out. |
The item was not rectified during the follow-up
audit session. |
|
|
24/12/2008 |
Standing water was observed near the tunnel at
Western Portal. The Contractor was reminded to dry it out. |
The item was not rectified during the follow-up
audit session. |
|
|
24/12/2008 |
Marine Works Foam and container were observed within the silt
curtain at Western Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
Sediment was observed carrying to the public road
at Western Portal. The workers have cleared the road immediately. However,
The Contractor was reminded to provide appropriate training to the workers
that all vehicle and plant should be cleared of earth, mud and debris before
leaving the site. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Standing water with discarded water bottles was
observed in the tank at Eastern Portal. The Contractor was reminded to clear
them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Milky water discharge was observed from
wastewater treatment unit at Eastern Portal. The Contractor was reminded to
remove deposited silt/grit at the silt removal facilities regularly to ensure
that these facilities can function properly at all time. |
*Follow-up action was needed for the item. |
|
|
29/12/2008 |
Leakage of water to the existing stream at the
access road at Eastern Portal was observed. The Contractor was reminded to
provide sand bag bund to prevent any wastewater discharging to the stream. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Muddy water and sediment was observed accumulate
at the paved area at Eastern Portal. The Contractor was reminded to provide
sand bag bund to surround the open channels to direct the silty runoff for
treatment before discharging out. |
*Follow-up action was needed for the item. |
|
|
29/12/2008 |
Standing water was observed near the tunnel at
Western Portal. The Contractor was reminded to dry it out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Air Quality |
24/12/2008 |
Sediment was observed carrying to the public road
at Western Portal. The workers have cleared the road immediately. However,
The Contractor was reminded to provide appropriate training to the workers
that all vehicle and plant should be cleared of earth, mud and debris before
leaving the site. |
Rectification/improvement
was observed during the follow-up audit session. |
|
29/12/2008 |
Opened cement bags were observed at Western
Portal. The Contractor was reminded to cover it with tarpaulin to control
dust emission. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Waste / Chemical Management |
03/12/2008 |
Chemical waste drums were observed standing on
the bare ground at Western Portal. The Contractor was reminded to dispose
them properly. |
The item was not rectified during the follow-up
audit session. |
|
03/12/2008 |
Construction materials were observed accumulate
at the drainage channel to nullah at Western Portal. The Contractor was
reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
03/12/2008 |
Sediment was observed accumulate at the U-Channel
at Intake MA17. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
03/12/2008 |
Oil stains were observed at underneath of
drilling rig at Eastern Portal. The Contractor was reminded to clear them and
properly maintain the plants to prevent further oil leakage. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
03/12/2008 |
Oil stains were observed at the paved area at
Eastern Portal. The Contractor was reminded to clear them. |
*Follow-up action was needed for the item. |
|
|
03/12/2008 |
The valve of drip tray at Intake MA17 was
observed not cover properly. The Contractor was reminded to seal it. |
The item was not rectified during the follow-up
audit session. |
|
|
10/12/2008 |
Oily part of equipment was observed standing on
the bare ground at Western Portal. The Contractor was reminded to remove them
and clear the oil stains as soon as possible. |
The item was not rectified during the follow-up
audit session. |
|
|
10/12/2008 |
Chemical waste drums were observed standing on
the bare ground at Western Portal. The Contractor was reminded to dispose
them properly. |
The item was not rectified during the follow-up
audit session. |
|
|
10/12/2008 |
Oil containers with chemical oil were observed
standing on the bare ground at Western Portal. The Contractor was reminded to
provide drip tray/store it properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
10/12/2008 |
The valve of drip tray at Intake MA17 was
observed not cover properly. The Contractor was reminded to seal it. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
10/12/2008 |
Oil leakage was observed from the generator at
Intake MA17. The Contractor was reminded to clear them and well-maintain the
equipment to prevent further oil leakage. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
10/12/2008 |
Oil stains were observed at the paved area at
Eastern Portal. The Contractor was reminded to clear them. |
*Follow-up action was needed for the item. |
|
|
10/12/2008 |
Part of equipment with remaining oil was observed
at the excess road at Eastern Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
17/12/2008 |
Oily part of equipment was observed standing on
the bare ground at Western Portal. The Contractor was reminded to remove them
and clear the oil stains as soon as possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
17/12/2008 |
Chemical waste drums were observed with drip tray
at Western Portal. The Contractor was reminded to store them at designated
chemical storage area and dispose them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
17/12/2008 |
Oil stains were observed at the paved area at
Eastern Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
Foam and container were observed within the silt
curtain at Western Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
C&D waste was observed at the existing stream
at Eastern Portal. The Contractor was reminded to clear them as soon as
possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
Oil stains were observed at the unpaved area at near
the existing stream at Eastern Portal. The Contractor was reminded to clear
them properly and well-maintained the plant to prevent further oil leakage. |
*Follow-up action was needed for the item. |
|
|
29/12/2008 |
Standing water with discarded water bottles was
observed in the tank at Eastern Portal. The Contractor was reminded to clear
them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Oil spillage was observed from the plant at near
of the existing stream at Eastern Portal. The Contractor was reminded to
clear the oil stains and well-maintained the plant equipment to prevent
further oil leakage. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Chemical containers were observed accumulate at
the site area of Western Portal. The Contractor was reminded to store it in
chemical waste storage area and dispose them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
29/12/2008 |
Oil drum was observed standing on the bare ground
at Western Portal. The Contractor was reminded to provide drip tray or store
it properly. |
The item was not rectified during the follow-up
audit session. |
|
|
Ecology |
03/12/2008 |
Sediment accumulates at the access road at
Eastern Portal. The Contractor was reminded to clear them. |
*Follow-up action was needed for the item. |
|
10/12/2008 |
Sediment accumulates at the access road at
Eastern Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
C&D waste was observed at the existing stream
at Eastern Portal. The Contractor was reminded to clear them as soon as
possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
Cement bags (abandon) were observed accumulate at
near the existing stream at Eastern Portal. The Contractor was reminded to
dispose them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
24/12/2008 |
Oil stains were observed at the unpaved area at
near the existing stream at Eastern Portal. The Contractor was reminded to
clear them properly and well-maintained the plant to prevent further oil
leakage. |
*Follow-up action was needed for the item. |
|
|
Reminders |
03/12/2008 |
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
03/12/2008 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
|
10/12/2008 |
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
|
10/12/2008 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
|
17/12/2008 |
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
|
|
17/12/2008 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
24/12/2008 |
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
|
24/12/2008 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
|
|
29/12/2008 |
The Contractor was reminded of the followings: - Construction
works at near the existing stream at Eastern Portal should be carried out
carefully to prevent any disturbance / damage to the stream. |
*Follow-up action was needed for the item. |
|
|
29/12/2008 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals and Intake sites. |
*Follow-up action was needed for the item. |
Note: (*) The Environmental deficiencies
have been rectified by the Contractor. However, the item was reoccurred during the
follow-up site audit due to construction activities/rainstorm. The Contractor
was reminded to rectify the deficiencies more frequently.