Table 5.2 Observations and
Recommendations of Site Inspections
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Water Quality |
04/02/2009 |
Silty water was observed discharging out to the
public road and U-Channel at Eastern Portal. The Contractor was reminded to
seal the hoarding and provide mitigation measures to prevent any wastewater
from discharging out. |
The item was not rectified during the follow-up
audit session. |
|
04/02/2009 |
Sediment was observed accumulate at the culvert
at Eastern Portal. The Contractor was reminded to clear them frequently. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
04/02/2009 |
Debris and stones were observed accumulate at the
U-Channel near the Wetsep at Western Portal. The Contractor was reminded to
clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
11/02/2009 |
Silty water was observed discharging out to the
public road at Eastern Portal. The Contractor was reminded to seal the
hoarding to prevent any wastewater from discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
18/02/2009 |
Standing water was observed at the drip tray at
Intake PFLR1. The Contractor was reminded to dry it out. |
The site was not observed during the site
inspection. |
|
|
18/02/2009 |
Drainage channel was observed without cover at
near the works at Intake PFLR1. The Contractor was reminded was reminded to
cover it properly. |
The site was not observed during the site
inspection. |
|
|
18/02/2009 |
Standing water was observed at the pit area of
the concrete blocks. The Contractor was reminded to pave them properly. |
The item was not rectified during the follow-up
audit session. |
|
|
27/02/2009 |
Standing water was observed at the pit area of
the concrete blocks at Eastern Portal. The Contractor was reminded to pave
them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
27/02/2009 |
Sediment was observed accumulated at the boundary
of the access road at Eastern Portal. The Contractor was reminded to erect
sand bag/concrete bund to prevent any sediment from carrying out. |
The item was not rectified during the follow-up
audit session. |
|
|
Air Quality |
11/02/2009 |
Dry unpaved area was observed at Western Portal.
The Contractor was reminded to provide water-spray more frequently. |
*Follow-up action was needed for the item. |
|
11/02/2009 |
Discarded cement bags were observed at near the
nullah at Western Portal. The Contractor was reminded to clear them. |
The site was not observed during the site
inspection. |
|
|
18/02/2009 |
Dry unpaved area was observed at Western Portal.
The Contractor was reminded to provide water-spray more frequently. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
18/02/2009 |
Over 20 cement bags were observed partly cover at
Western Portal. The Contractor was reminded to cover them properly to prevent
dust emission. |
The item was not rectified during the follow-up
audit session. |
|
|
27/02/2009 |
Discarded cement bags were observed at Eastern
Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Waste / Chemical Management |
11/02/2009 |
Oil leakage was observed at the coffer dam at
Western Portal. The Contractor was reminded to clear them as soon as
possible. |
Rectification/improvement
was observed during the follow-up audit session. |
|
11/02/2009 |
General refuses were observed disposed not
properly at Western Portal. The Contractor was reminded to clean them up. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
11/02/2009 |
Sediment and general refuses were observed
deposited at the nullah at Western Portal. The Contractor was reminded to
clear them. |
The site was not observed during the site
inspection. |
|
|
27/02/2009 |
Paint was observed leaking to the drainage
channel at Intake W0. The Contractor was reminded to clear them properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
27/02/2009 |
General refuses were observed around the site at
Western Portal. The Contractor was reminded to maintain the site tidiness. |
*Follow-up action was needed for the item. |
|
|
Reminders |
04/02/2009 |
The Contractor was reminded of the followings: - Stockpile
should be covered with tarpaulin after the works at Intake W0 and SM1 to
control dust generation. |
Rectification/improvement
was observed during the follow-up audit session. |
|
04/02/2009 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals especially the Intake sites. |
*Follow-up action was needed for the item. |
|
|
11/02/2009 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals especially the Intake sites. |
*Follow-up action was needed for the item. |
|
|
18/02/2009 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals especially the Intake sites. |
*Follow-up action was needed for the item. |
|
|
27/02/2009 |
The Contractor was reminded of the followings: - Properly
maintain the treatment process for the silty water at Tai Hang Stream at Eastern
Portal. |
*Follow-up action was needed for the item. |
|
|
27/02/2009 |
The Contractor was reminded of the followings: - Properly
maintain the silt curtain at Western Portal to ensure that the silt curtain
can function properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
27/02/2009 |
The Contractor was reminded of the followings: - Keep
clear the standing water in the label bags that secure around the trees at
Eastern, Western Portals especially the Intake sites. |
*Follow-up action was needed for the item. |
Note: (*) The Environmental deficiencies have been rectified
by the Contractor. However, the item was reoccurred during the follow-up site
audit due to construction activities/rainstorm. The Contractor was reminded to
rectify the deficiencies more frequently.