
TABLE OF
CONTENTS
Introduction
Environmental
Monitoring Works
Environmental
Licenses and Permits
Key
Information in the Reporting Month
Background
Project
Organizations
Construction
Programme
Summary
of EM&A Requirements
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
Results
and Observations
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Maintenance
and Calibration
Results
and Observations
Monitoring
Requirements
Monitoring
Locations
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology, Calibration Details and QA/QC Procedures
Results
and Observations
Underground
water level
Site
Audits
Review
of Environmental Monitoring Procedures
Status
of Environmental Licensing and Permitting
Status
of Waste Management
Implementation
Status of Environmental Mitigation Measures
Non-compliance
Recorded during Site Inspections
Summary
of Mitigation Measures Implemented
Implementation
Status of Event Action Plans
Summary
of Complaint, Warning, Notification of any Summons and Successful Prosecution
Key
Issues for the Coming Month
Monitoring
Schedule for the Next Month
Construction
Program for the Next Month
7. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST
OF TABLES
Table I Summary
Table for Non-compliance Recorded in the Reporting Month
Table II Summary
Table for Key Information in the Reporting Month
Table 1.1 Key
Project Contacts
Table 2.1 Locations
for Air Quality Monitoring
Table 2.2 Air
Quality Monitoring Equipment
Table 2.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 2.4 Summary
Table of Air Quality Monitoring Results during the reporting month
Table 3.1 Noise
Monitoring Stations
Table 3.2 Noise
Monitoring Equipment
Table 3.3 Noise
Monitoring Parameters, Frequency and Duration
Table 3.4 Baseline
Noise Level and Noise Limit Level for Monitoring Stations
Table 3.5 Summary
Table of Noise Monitoring Results during the reporting month
Table 3.6 Ground
Borne Noise Monitoring Parameters, Frequency and Duration
Table 3.7 Construction
Ground Borne Noise Standards
Table 3.8 Summary
Table of Ground Borne Noise Monitoring Results during the Reporting Month
Table 4.1 Locations
for Water Quality Monitoring
Table 4.2 Water
Quality Monitoring Equipment
Table 4.3 Frequency
and Parameters of Water Quality Monitoring
Table 4.4 Ground
Water Level Monitoring Data at Location ADH48
Table 5.1 Summary
of Environmental Licensing and Permit Status
Table 5.2 Observations
and Recommendations of Site Inspections
LIST
OF FIGURES
Figure 1.1 Layout
Plan of the Project Site
Figure 2.1 ET’s
Organization Chart
Figure 3.1a Locations
of Air Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations
of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure
3.1c Locations
of Construction Noise Monitoring Stations at Intake W0
Figure 4.1a-b Locations
of Water Quality Monitoring Stations
Figure 4.2 Location
of Ground Water Level Monitoring Stations
LIST
OF APPENDICES
A Action
and Limit Levels for Air Quality and Noise
B Copies
of Calibration Certificates
C Quality
Control Reports for SS Laboratory Analysis
D Environmental
Monitoring Schedules
E 1-hour
TSP Monitoring Results, Graphical Presentations
F 24-hour
TSP Monitoring Results, Graphical Presentations
G Noise
Monitoring Results and Graphical Presentations
H Water
Quality Monitoring Results and Graphical Presentations (Do, Turb & SS)
J Wind Data (Eastern Portal & Western Portal)
L Environmental
Mitigation Implementation Schedule (EMIS)
ABBREVIATION
AND ACRONYM
AL
Levels Action
and Limit Levels
CEDD Civil Engineering &
Development Department
E
/ ER Engineer/Engineer’s
Representative
EIA Environmental
Impact Assessment
EM&A Environmental Monitoring
and Audit
EMIS Environmental
Mitigation Implementation Schedule
EP Environmental
Permit
EPD Environmental
Protection Department
ET Environmental
Team
HVS High
Volume Sampler
IEC Independent
Environmental Checker
RE Resident
Engineer
RH Relative
Humidity
TSP Total
Suspended Particulates
QA/QC Quality
Assurance / Quality Control
SLM Sound
Level Meter
WMP Waste
Management Plan