Table 5.2 Observations and
Recommendations of Site Inspections
|
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
|
Water Quality |
13/08/2009 |
Milky waste water was observed accumulated at
Western Portal. The Contractor was reminded to pump the wastewater out for
treatment before discharging out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
13/08/2009 |
Stagnant water was observed accumulated at the
abandoned sedimentation tank at Eastern Portal. The Contractor was reminded
to dry it out. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
13/08/2009 |
Silt and sand were observed accumulated at the
access road at Eastern Portal. The Contractor was reminded to clear them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
13/08/2009 |
Mud was observed from clogging the drainage
channel at Intake MB16. The Contractor was reminded to clear them. |
This item was not observed during the follow-up
site audit session. |
|
|
19/08/2009 |
Silty water was observed discharging out from
Intake SM1. The Contractor was reminded to cleanup the sedimentation tank
regularly to ensure efficient performance of water treatment plant. |
This item was not observed during the follow-up
audit session. |
|
|
19/08/2009 |
Water quality inside the sedimentation
compartment was milky at Western Portal. The Contractor was reminded to
maintain the water treatment facility can function properly. |
Follow-up
action was needed for the item. |
|
|
27/08/2009 |
Water quality inside the compartment of wetsep
was slightly milky and the milky water was observed discharging out at
Eastern Portal. The Contractor was reminded to ensure the water treatment
facility can function properly. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
27/08/2009 |
Milky water from the spoil basin was observed
leaking out at the sand bag bund at Eastern Portal. The Contractor was
reminded to erect concrete bund or other appropriate to prevent any
wastewater leaking out. |
Rectification/improvement
was not observed
during the follow-up audit session. |
|
|
27/08/2009 |
A pit of silty water was observed at underneath
of water diversion pipe at Eastern Portal. The Contractor was reminded to
provide mitigation measure to avoid any silty water discharging to the public
drain. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Noise |
04/08/2009 |
Gap was observed at the noise enclosure at
Eastern Portal. The Contractor was reminded to seal the gap before the
operation of TBM. |
#Follow-up action was needed for the item. |
|
04/08/2009 |
Noise mitigation measures was observed
insufficient for the further noise generation works (e.g. rock breaking) at
Eastern Portal. The Contractor was reminded to review the implementation of
appropriate mitigation measures. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
27/08/2009 |
Noise was noticed from the rock breaking works
(with movable noise barrier) at Eastern Portal. The Contractor was reminded
to provide and further review the noise mitigation measures implemented for
the noise generation works. |
Follow-up
action was needed for the item. |
|
|
Waste / Chemical Management |
04/08/2009 |
Chemical waste storage area was observed without
chemical waste label at Eastern Portal. The Contractor was reminded to attach
it with appropriate label. |
Rectification/improvement
was observed during the follow-up audit session. |
|
04/08/2009 |
Paint containers were observed to be placed near
the drainage channel at Western Portal. The Contractor was reminded to clear
them. |
Rectification/improvement
was observed during the follow-up audit session. |
|
|
Reminders |
04/08/2009 |
The Contractor was reminded of the followings: - Clear
the stagnant water at the area that may retain water after the rain at
Eastern & Western Portal. |
Rectification/improvement
was observed during the follow-up audit session. |
|
13/08/2009 |
The Contractor was reminded of the followings: - Seal
the remaining narrow gap at the noise enclosure at Eastern Portal. |
Follow-up
action was needed for the item. |
|
|
19/08/2009 |
The Contractor was reminded of the followings: - Seal
the remaining narrow gap at the noise enclosure at Eastern Portal. |
Follow-up
action was needed for the item. |
|
|
27/08/2009 |
The Contractor was reminded of the followings: -
Seal the remaining narrow gap at the noise enclosure at Eastern Portal. |
Rectification/improvement
was observed during the follow-up audit session. |
Note: (*) The Environmental deficiencies have been rectified
by the Contractor. However, the item was reoccurred during the follow-up site
audit due to construction activities/rainstorm. The Contractor was reminded to
rectify the deficiencies more frequently.
(#) No TBM operated were
observed during the site inspection.