
TABLE
OF CONTENTS
Introduction
Environmental Monitoring Works
Environmental Licenses and Permits
Key Information in the Reporting Month
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Airborne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Ground Borne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Results and Observations
Monitoring Requirements
Monitoring Locations
Results and Observations
Underground water level
Site Audits
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Status of Waste Management
Implementation Status of Environmental Mitigation Measures
Non-compliance Recorded during Site Inspections
Summary of Mitigation Measures Implemented
Implementation Status of Event Action Plans
Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
Construction Program for the Next Month
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
lIST OF TABLES
Table I Summary
Table for Non-compliance Recorded in the Reporting Month
Table II Summary
Table for Key Information in the Reporting Month
Table 1.1 Key
Project Contacts
Table 2.1 Locations
for Air Quality Monitoring
Table 2.2 Air
Quality Monitoring Equipment
Table 2.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 2.4 Summary
Table of Air Quality Monitoring Results
during the reporting
month
Table 3.1 Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise
Monitoring Parameters, Frequency and Duration
Table 3.4 Baseline
Noise Level and Noise Limit Level for Monitoring Stations
Table 3.5 Summary
Table of Noise Monitoring Results during the
reporting month
Table 3.6 Ground
Borne Noise Monitoring Parameters, Frequency and Duration
Table 3.7 Construction
Ground Borne Noise Standards
Table
3.8 Summary
Table of Ground Borne Noise Monitoring Results during the reporting month
Table 4.1 Locations
for Water Quality Monitoring
Table 4.2 Ground
Water Level Monitoring Data
Table 5.1 Summary
of Environmental Licensing and Permit Status
Table 5.2 Observations
and Recommendations of Site Inspections
lIST OF FIGUREs
Figure 1.1 Layout Plan
of the Project Site
Figure 2.1 ET’s
Organization Chart
Figure 3.1a Locations of Air
Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations
of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure 3.1c Locations
of Construction Noise Monitoring Stations at Intake E7
Figure 3.1d Locations
of Construction Noise Monitoring Stations at Intake PFLR1
Figure 3.1e Locations
of Construction Noise Monitoring Stations at Intake W0
Figure 3.1f Locations
of Construction Noise Monitoring Stations at Intake RR1
Figure 3.1g Locations
of Construction Noise Monitoring Stations at Intake W5
Figure 3.1h Locations
of Construction Noise Monitoring Stations at Intake E5A
Figure 3.1i Locations
of Construction Noise Monitoring Stations at Intake THR2
Figure 3.1j Locations
of Construction Noise Monitoring Stations at Intake P5
Figure 3.1k Locations
of Construction Noise Monitoring Stations at Intake W8
Figure 3.1l Location
of Construction Ground Borne Noise Monitoring Station
Figure 4.1a-b Locations of Water Quality
Monitoring Stations
Figure 4.2a-e Location of Ground Water Level
Monitoring Stations
LIST
OF APPENDICES
A Action and Limit Levels
for Air Quality and Noise
B Copies of Calibration
Certificates
C Wind
Data (Eastern Portal & Western Portal)
D Environmental
Monitoring Schedules
E 1-hour TSP
Monitoring Results, Graphical Presentations
F 24-hour TSP
Monitoring Results, Graphical Presentations
G Noise Monitoring
Results and Graphical Presentations