
TABLE OF CONTENTS
Introduction
Environmental
Monitoring Works
Environmental Licenses
and Permits
Key Information in the
Reporting Month
Background
Project Organizations
Construction Programme
Summary of EM&A
Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology
and QA/QC Procedure
Results and
Observations
Airborne Construction
Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology
and QA/QC Procedures
Maintenance and
Calibration
Results and
Observations
Ground Borne
Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Results and
Observations
Monitoring Requirements
Monitoring Locations
Results and
Observations
Underground water level
Site Audits
Review of Environmental
Monitoring Procedures
Status of Environmental
Licensing and Permitting
Status of Waste
Management
Implementation Status
of Environmental Mitigation Measures
Non-compliance Recorded
during Site Inspections
Summary of Mitigation
Measures Implemented
Implementation Status
of Event Action Plans
Summary of Complaint,
Warning, Notification of any Summons and Successful Prosecution
Key Issues for the
Coming Month
Monitoring Schedule for
the Next Month
Construction Program
for the Next Month
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table
I Summary
Table for Non-compliance Recorded in the Reporting Month
Table
II Summary Table for Key
Information in the Reporting Month
Table 1.1 Key
Project Contacts
Table 2.1 Locations
for Air Quality Monitoring
Table 2.2 Air
Quality Monitoring Equipment
Table 2.3 Impact
Dust Monitoring Parameters, Frequency and Duration
Table 2.4 Summary
Table of Air Quality Monitoring Results during the reporting month
Table 3.1 Noise
Monitoring Stations
Table 3.2 Noise
Monitoring Equipment
Table 3.3 Noise
Monitoring Parameters, Frequency and Duration
Table 3.4 Baseline
Noise Level and Noise Limit Level for Monitoring Stations
Table 3.5 Summary
Table of Noise Monitoring Results during the reporting month
Table 4.1 Locations
for Water Quality Monitoring
Table 4.2 Ground
Water Level Monitoring Data
Table 5.1 Summary
of Environmental Licensing and Permit Status
Table 5.2 Observations
and Recommendations of Site Inspections
LIST OF FIGURES
Figure 1.1
Layout Plan of the Project Site
Figure 2.1 ET’s Organization Chart
Figure 3.1a Locations
of Air Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations
of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure
3.1c Locations
of Construction Noise Monitoring Stations at Intake E7
Figure
3.1d Locations
of Construction Noise Monitoring Stations at Intake PFLR1
Figure
3.1e Locations
of Construction Noise Monitoring Stations at Intake W0
Figure
3.1f Locations
of Construction Noise Monitoring Stations at Intake RR1
Figure
3.1g Locations
of Construction Noise Monitoring Stations at Intake W5
Figure
3.1h Locations
of Construction Noise Monitoring Stations at Intake E5A
Figure
3.1i Locations
of Construction Noise Monitoring Stations at Intake THR2
Figure
3.1j Locations
of Construction Noise Monitoring Stations at Intake P5
Figure
3.1k Locations
of Construction Noise Monitoring Stations at Intake W8
Figure
3.1l Locations
of Construction Noise Monitoring Stations at Intake DG1
Figure
3.1m Locations
of Construction Noise Monitoring Stations at Intake MA14
Figure 4.1a-b Locations of Water Quality
Monitoring Stations
Figure 4.2a-e Location
of Ground Water Level Monitoring Stations
LIST OF APPENDICES
A Action
and Limit Levels for Air Quality, Noise and Water Quailty
B Copies
of Calibration Certificates
C Wind Data (Eastern Portal & Western Portal)
D Environmental
Monitoring Schedules
E 1-hour
TSP Monitoring Results, Graphical Presentations
F 24-hour
TSP Monitoring Results, Graphical Presentations
G Noise
Monitoring Results and Graphical Presentations
J Environmental
Mitigation Implementation Schedule (EMIS)