
TABLE OF
CONTENTS
Introduction
Environmental Monitoring Works
Environmental Licenses and Permits
Key Information in the Reporting Month
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedure
Results and Observations
Airborne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC
Procedures
Maintenance and Calibration
Results and Observations
Ground Borne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology, Calibration
Details and QA/QC Procedures
Results and Observations
Underground water level
Site Audits
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and
Permitting
Status of Spoil Management
Implementation Status of Environmental
Mitigation Measures
Non-compliance Recorded during Site Inspections
Summary of Mitigation Measures
Implemented
Implementation Status of Event Action
Plans
Summary of Complaint, Warning,
Notification of any Summons and Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
Construction Program for the Next Month
7. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary Table for
Non-compliance Recorded in the Reporting Month
Table II Summary Table for Key
Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air Quality Monitoring
Table 2.2 Air Quality Monitoring Equipment
Table 2.3 Impact Dust Monitoring Parameters,
Frequency and Duration
Table 2.4 Summary Table of Air Quality Monitoring
Results during the reporting month
Table 3.1 Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise Monitoring Parameters, Frequency
and Duration
Table 3.4 Noise Limit Level for Monitoring Stations
Table 3.5 Summary Table of Noise Monitoring Results
during the reporting month
Table 3.6 Ground Borne Noise Monitoring Parameters,
Frequency and Duration
Table 3.7 Construction Ground Borne Noise Standards
Table 3.8 Summary Table of Ground Borne Noise
Monitoring Results during the Reporting Month
Table 4.1 Locations for Water Quality Monitoring
Table 4.2 Water Quality Monitoring Equipment
Table 4.3 Frequency and Parameters of Water Quality
Monitoring
Table 4.4 Ground Water Level Monitoring Data
Table 5.1 Summary of Environmental Licensing and
Permit Status
Table 5.2 Observations and Recommendations of Site
Inspections
LIST OF FIGURES
Figure 1.1 Layout
Plan of the Project Site
Figure 2.1 ET’s
Organization Chart
Figure 3.1a Locations of Air
Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations of Air
Quality and Construction Noise Monitoring Stations at Western Portal
Figure 3.1c Locations of
Construction Noise Monitoring Stations at Intake E7
Figure 3.1d Locations of
Construction Noise Monitoring Stations at Intake PFLR1
Figure 3.1e Locations of
Construction Noise Monitoring Stations at Intake W0
Figure 3.1f Locations of
Construction Noise Monitoring Stations at Intake RR1
Figure 3.1g Locations of
Construction Noise Monitoring Stations at Intake W5
Figure 3.1h Locations of
Construction Noise Monitoring Stations at Intake E5A
Figure 3.1i Locations
of Construction Noise Monitoring Stations at Intake THR2
Figure 3.1j Locations
of Construction Noise Monitoring Stations at Intake P5
Figure 3.1k Locations of
Construction Noise Monitoring Stations at Intake W8
Figure 3.1l Locations
of Construction Noise Monitoring Stations at Intake DG1
Figure 3.1m Locations of
Construction Noise Monitoring Stations at Intake MA14
Figure 3.1n Locations of
Construction Noise Monitoring Stations at Intake BR6
Figure 3.1o Location of
Construction Ground Borne Noise Monitoring Station
Figure 4.1a-b Locations of Water Quality
Monitoring Stations
Figure 4.2a-e Location of Ground Water Level
Monitoring Stations
LIST OF APPENDICES
A Action and Limit Levels for Air
Quality, Noise and Water Quality
B Copies of Calibration Certificates
C Wind
Data (Eastern Portal & Western Portal)
D Environmental Monitoring Schedules
E 1-hour TSP Monitoring Results,
Graphical Presentations
F 24-hour TSP Monitoring
Results, Graphical Presentations
G Noise Monitoring Results and
Graphical Presentations
J Environmental
Mitigation Implementation Schedule (EMIS)
O Quality Control Reports for SS
Laboratory Analysis
P Baseline
Review for Marine Water Quality Monitoring (Water Quality Monitoring Results,
Graphical – DO, Turb & SS)
LIST OF ANNEX
I Review Report on
Handling & Delivery of Excavation Materials at The Western Portal