TABLE OF CONTENTS
Introduction
Environmental Monitoring Works
Environmental Licenses and Permits
Key Information in the Reporting Month8
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Airborne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Ground Borne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and
Duration
Results and Observations
Monitoring Requirements
Monitoring Locations
Results and Observations
Underground water level
Site Audits
Review of Environmental Monitoring
Procedures
Status of Environmental Licensing and
Permitting
Status of Spoil Management
Implementation Status of Environmental
Mitigation Measures
Non-compliance Recorded during Site
Inspections
Summary of Mitigation Measures Implemented
Implementation Status of Event Action Plans
Summary of Complaint, Warning, Notification
of any Summons and Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
Construction Program for the Next Month
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary Table for Non-compliance Recorded in the Reporting Month
Table II Summary
Table for Key Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air Quality Monitoring
Table 2.2 Air Quality Monitoring Equipment
Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration
Table 2.4 Summary Table of Air Quality Monitoring Results during the reporting month
Table 3.1 Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise Monitoring Parameters, Frequency and Duration
Table 3.4 Noise Limit Level for Monitoring Stations
Table 3.5 Summary Table of Noise Monitoring Results during the reporting month
Table 3.6 Ground Borne Noise Monitoring Parameters, Frequency and Duration
Table 3.7 Construction Ground Borne Noise Standards
Table 3.8 Summary Table of Ground Borne Noise Monitoring Results during the Reporting Month
Table 4.1 Locations for Water Quality Monitoring
Table 5.1 Summary of Environmental Licensing and Permit Status
Table 5.2 Observations and Recommendations of Site Inspections
LIST OF FIGURES
Figure 1.1 Layout Plan of the Project Site
Figure 2.1 ET¡¦s Organization Chart
Figure 3.1a Locations of Air Quality
and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure 3.1c Locations of Construction Noise Monitoring Stations at Intake E7
Figure 3.1d Locations of Construction Noise Monitoring Stations at Intake PFLR1
Figure 3.1e Locations of Construction Noise Monitoring Stations at Intake W0
Figure 3.1f Locations of Construction Noise Monitoring Stations at Intake RR1
Figure 3.1g Locations of
Construction Noise Monitoring Stations at Intake W5
Figure 3.1h Locations of Construction Noise Monitoring Stations at Intake E5A
Figure 3.1i Locations of Construction Noise Monitoring Stations at Intake THR2
Figure 3.1j Locations of Construction Noise Monitoring Stations at Intake P5
Figure 3.1k Locations of Construction Noise Monitoring Stations at Intake W8
Figure 3.1l Locations
of Construction Noise Monitoring Stations at Intake DG1
Figure 3.1m Locations of Construction Noise Monitoring Stations at Intake MA14
Figure 3.1n Locations of Construction Noise Monitoring Stations at Intake BR6
Figure 3.1o Location of Construction Ground Borne Noise Monitoring Station
Figure 4.1a-b Locations of Water Quality Monitoring Stations
Figure 4.2a-e Location of Ground Water Level Monitoring Stations
LIST OF APPENDICES
A Action and Limit Levels for Air Quality, Noise and Water Quality
B Copies of Calibration Certificates
C Wind
Data (Eastern Portal and Western Portal)
D Environmental Monitoring Schedules
E 1-hour TSP Monitoring Results, Graphical Presentations
F 24-hour TSP
Monitoring Results, Graphical Presentations
G Noise Monitoring Results and Graphical Presentations
J Environmental Mitigation Implementation Schedule (EMIS)
LIST OF ANNEX
I Review Report on Handling & Delivery of Excavation Materials at The Western Portal
II Proposal of Two Blasts Per Day in Western Adits