TABLE OF CONTENTS
Introduction
Environmental Monitoring Works
Environmental Licenses and Permits
Key Information in the Reporting Month
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedure
Results and Observations
Airborne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Ground Borne Construction Noise Monitoring
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Results and Observations
Monitoring Requirements
Monitoring Locations
Results and Observations
Underground water level
Site Audits
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Status of Spoil Management
Implementation Status of Environmental Mitigation
Measures
Non-compliance Recorded during Site Inspections
Summary of Mitigation Measures Implemented
Implementation Status of Event Action Plans
Summary of Complaint, Warning, Notification of any
Summons and Successful Prosecution
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
Construction Program for the Next Month
7. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table I Summary
Table for Non-compliance Recorded in the Reporting Month
Table II Summary
Table for Key Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air
Quality Monitoring
Table 2.2 Air Quality Monitoring
Equipment
Table 2.3 Impact Dust Monitoring
Parameters, Frequency and Duration
Table 2.4 Summary Table of Air
Quality Monitoring Results during the reporting month
Table 3.1 Noise Monitoring
Stations
Table 3.2 Noise Monitoring
Equipment
Table 3.3 Noise Monitoring
Parameters, Frequency and Duration
Table 3.4 Noise Limit Level for
Monitoring Stations
Table 3.5 Summary Table of Noise
Monitoring Results during the reporting month
Table 3.6 Ground
Borne Noise Monitoring Parameters, Frequency and Duration
Table 3.7 Construction Ground
Borne Noise Standards
Table 3.8 Summary Table of Ground
Borne Noise Monitoring Results during the Reporting Month
Table 4.1 Locations for Water
Quality Monitoring
Table 4.4 Ground Water Level
Monitoring Data
Table 5.1 Summary of
Environmental Licensing and Permit Status
Table 5.2 Observations and
Recommendations of Site Inspections
LIST OF FIGURES
Figure 1.1 Layout
Plan of the Project Site
Figure 2.1 ET’s
Organization Chart
Figure 3.1a Locations
of Air Quality and Construction Noise Monitoring Stations at Eastern Portal
Figure 3.1b Locations
of Air Quality and Construction Noise Monitoring Stations at Western Portal
Figure 3.1c Locations
of Construction Noise Monitoring Stations at Intake E7
Figure 3.1d Locations
of Construction Noise Monitoring Stations at Intake PFLR1
Figure 3.1e Locations
of Construction Noise Monitoring Stations at Intake W0
Figure 3.1f Locations
of Construction Noise Monitoring Stations at Intake RR1
Figure 3.1g Locations
of Construction Noise Monitoring Stations at Intake W5
Figure 3.1h Locations
of Construction Noise Monitoring Stations at Intake E5A
Figure 3.1i Locations
of Construction Noise Monitoring Stations at Intake THR2
Figure 3.1j Locations
of Construction Noise Monitoring Stations at Intake P5
Figure 3.1k Locations
of Construction Noise Monitoring Stations at Intake W8
Figure 3.1l Locations
of Construction Noise Monitoring Stations at Intake DG1
Figure 3.1m Locations
of Construction Noise Monitoring Stations at Intake MA14
Figure 3.1n Locations
of Construction Noise Monitoring Stations at Intake BR6
Figure 3.1o Location
of Construction Ground Borne Noise Monitoring Station
Figure 4.1a-b Locations
of Water Quality Monitoring Stations
Figure 4.2a-e Location
of Ground Water Level Monitoring Stations
LIST OF APPENDICES
A Action and Limit Levels
for Air Quality, Noise and Water Quality
B Copies of Calibration
Certificates
C Wind
Data (Eastern Portal&
Western Portal)
D Environmental
Monitoring Schedules
E 1-hour TSP
Monitoring Results, Graphical Presentations
F 24-hour TSP
Monitoring Results, Graphical Presentations
G Noise Monitoring
Results and Graphical Presentations
J Environmental
Mitigation Implementation Schedule (EMIS)
LIST OF ANNEX
I Review Report on Handling &
Delivery of Excavation Materials at The Western Portal